Friday, 27 March 2009

Final Product

During monday after school and tuesday Jordan and I edited all the new film and recorded a voice over on it. We also put a soundtrack on the film. We thought that our second attempt at the opening was much more of a success than the first as we applied more codes and conventions of a romantic comedy, for example costume and voice over.

In todays lesson, Friday 27th March, we handed in both our preliminary task and film opening burnt onto a disk, and I handed in my portfolio of work. I think having to re-film made it much more difficult as we had to produce a new storyboard.

Monday, 23 March 2009

Filming of our Rom Com

After school thursday last week, our group got together along with the entire cast and filmed all of the footage we needed for out project. We found it difficult to stick to the storyboard however once we got everything done it was okay.

However the clips we filmed from thursday didn't make sense to the conventions of a romantic comedy as the costume and plot didn't seem right. This lead us to having to completley re-think our idea and film again today on Monday 23rd march. We managed to get everything filmed within the school and i took a camera home to film certain elements we needed.

Tomorrow we will hopefully put our footage together again to see if this is more of a success than the previous attempt.

Wednesday, 11 March 2009

Wednesday 11th March

In todays lesson as a group we construced a casting list of people we want to feature in our clip. We tried to use people availble around our scheduling time and people we know who will be reliable to help the filming run smoothly.

We also constructed a filming schedule of times and places when we will film certain shots. We deicded to try and get the majority, if not all, of the filming done in one afternoon because we felt different filming times would be difficult as people may have different costumes, the setting and weather might not be the same etc.

Completed storyboard

In mondays single lesson, we completed our storyboard as a group. We decided to split it up into 3 main sections. In total, we have 26 shots. Predominantly set in school within a class room.

We tried to make it realistic settings to film in and contain a range of camera movements/shots.

Friday, 6 March 2009

Friday 6th March

In todays lesson we delivered our pitch on our romantic comedy "The date" powerpoint presentation. I think we could have gone into more detail with the synopsis however i think that after summarizing the ideas it made it easier for us to begin to storyboard. 

Also, other people suggested a few ideas for our film to make it better and we took these in to account. We have made a brief plan on our storyboard and then we will have to put it into diagrams next lesson. 

Friday 27th february

In today's lesson after completing our preliminary task, we were given a new task of planning a pitch for our film. We had to include:

  • A complete film synopsis
  • Script for the opening scene
  • Detailed description of the opening scenes
  • Character profiles
  • Power point presentation on the summary of our ideas
We worked well as a group and decided to plan first on paper, and then type up our ideas on to the powerpoint. We typed the script up separately on word. I think the task was helpful in getting all our ideas together and finding the strengths and weaknesses of the codes & conventions we had chosen.